NEW COLUMNS IN THE BUDGET TABLE IN PD
Three new columns have been added to the Budgets table that displays when you click on the Budget option in Proposal Development (PD) documents. The columns are:
- F&A Rate – displays the Applicable Rate that was entered in the Rates/Research F&A column of the budget.
- F&A Rate Type – displays the F&A Rate Type that was selected in the Budget Settings for the budget.
- Total Cost Sharing – displays the cost share amount that was manually entered (for summary budgets) or system calculated (for detailed budgets). Reminder – only required cost share should be entered in the KR Budget Module. Voluntary Cost share should be described in the Supplemental Information option of the PD.
Please verify that the information is accurate for the budget version that is marked to Include for Submission. This applies to both detailed and summary budgets in KR. If the information is incorrect, OSP/BC will request the information be corrected prior to approval. This information needs to be correct for proposal reviewers, reporting, and downstream impacts at the award stage.